Madison, WI Header
File #: 33920    Version: 1 Name: Authorizing the Mayor & City Clerk to execute an agreement with MSA Professional Services for design engineering services for the design of sanitary sewer with WDOT Stoughton Road (USH 51) Bridge Overpass over Cottage Grove Rd.
Type: Resolution Status: Passed
File created: 4/29/2014 In control: BOARD OF PUBLIC WORKS
On agenda: 5/20/2014 Final action: 5/20/2014
Enactment date: 5/21/2014 Enactment #: RES-14-00420
Title: Authorizing the Mayor and the City Clerk to execute an agreement with MSA Professional Services for design engineering services for the design of sanitary sewer with the Wisconsin Department of Transportation (WisDOT) Stoughton Road (USH 51) Bridge Overpass over Cottage Grove Road.
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 00373062 Scope of Services DRAFT 042114.pdf, 2. posDesignProf 2014.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
5/20/20141 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
5/7/20141 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
4/29/20141 Engineering Division Referred  Action details Meeting details Not available
Fiscal Note
Budget authority is available in Acct. No. ES01-58275-810332-00-53W1203
Est. cost is $7,900.00
Title
Authorizing the Mayor and the City Clerk to execute an agreement with MSA Professional Services for design engineering services for the design of sanitary sewer with the Wisconsin Department of Transportation (WisDOT) Stoughton Road (USH 51) Bridge Overpass over Cottage Grove Road.
Body
PREAMBLE
 
The City is proposing to relocate sanitary sewer with the Wisconsin Department of Transportation (WisDOT) Stoughton- Madison Road (Cottage Grove Road, Overpass B-13-210) project.  The proposed bridge columns will be in conflict with the City Sewer.   The City sanitary sewer is undersized and will be upsized to and 18" diameter sewer with the project.  In total 1,560 feet of sanitary sewer main will be relocated and upsized on Cottage Grove Road.  The consultant's services will include sanitary sewer design and preparation of plans and specifications.    
 
The City Engineer recommends the design engineering contract be awarded to MSA Professional Services.  MSA Professional Services is already under contract with the WisDOT to design the bridge improvements.  Given the extent of proposed street and utility work, MSA Professional Services was selected to prevent any setbacks in the design process.  
 
NOW THEREFORE BE IT RESOLVED that the Mayor and City Clerk are hereby authorized to execute an agreement with MSA Professional Services for design engineering services for the design of sanitary sewer with the Wisconsin Department of Transportation (WisDOT) Stoughton Road (USH 51) Bridge Overpass over Cottage Grove Road.  This is a sole source contract based upon the reasons mentioned above.