Madison, WI Header
File #: 53163    Version: 1 Name: Authorizing the Mayor and the City Clerk to execute an Amendment to the contract between Madison and Strand Associates, Inc. for additional design engineering services for the Blair/John Nolen Intersection final design.
Type: Resolution Status: Passed
File created: 9/13/2018 In control: Engineering Division
On agenda: 10/2/2018 Final action: 10/2/2018
Enactment date: 10/5/2018 Enactment #: RES-18-00716
Title: Authorizing the Mayor and the City Clerk to execute an Amendment to the contract between Madison and Strand Associates, Inc. for additional design engineering services for the Blair/John Nolen Intersection final design. (4th & 6th ADs)
Sponsors: Michael E. Verveer, Marsha A. Rummel
Attachments: 1. Item 8_2018_03_22 Overview_Exhibit.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
10/2/20181 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
9/26/20181 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
9/13/20181 Engineering Division Refer  Action details Meeting details Not available

Fiscal Note

The proposed resolution approves the contract amendment for design engineering services for the Blair/John Nolen Intersection at an estimated cost of $375,000. Funding for this contract amendment is provided by GO Borrowing via the

Blair/John Nolen Intersection project which authorized $500,000 in the adopted 2018 capital budget (MUNIS #11135).

 

MUNIS:

11135-402-170

 

Title

Authorizing the Mayor and the City Clerk to execute an Amendment to the contract between Madison and Strand Associates, Inc. for additional design engineering services for the Blair/John Nolen Intersection final design.  (4th & 6th ADs)

Body

PREAMBLE:                     

 

The City is proposing to reconstruct John Nolen Drive & S Blair Street (State Hwy 151) at the intersection of E Wilson St and Williamson St in 2021.  The City entered into an agreement with Strand Associates, Inc. for design services (Original: RES-16-00361).  A corridor study was performed and accepted by Common Council and geometry approved for the intersection (RES-18-00489).  City Engineering & City Traffic Engineering were authorized to proceed with final design for reconstruction of the intersection.   

 

The City Engineer recommends that additional design services be undertaken by Strand Associates, Inc.  They are:

 

1.                     Prepare Environmental Document for project

2.                     Prepare Section 4f documentation (public recreation lands analysis)

3.                     Prepare Section 106 documentation (archaeological & historical analysis)

4.                     Final Roadway design

5.                     Final Utility design

6.                     Railroad Coordination and OCR hearing

7.                     Prepare Final Plans, Specifications & Estimate for the reconstruction project

 

 

NOW THEREFORE BE IT RESOLVED that the Mayor and City Clerk are hereby authorized to execute an Amendment to the contract between Madison and Strand Associates, Inc. for additional design engineering services for the Blair/John Nolen Intersection final design.