Title
Request by TDS Metrocom to install the buried fiber optic cable within right-of-way limits at the following locations: Pflaum Road east from Stoughton Road to Advance Road south on Advance Road to Progress Road south on Progress Road to 2617 Progress Road.
Body
PUBLIC NOTICE
TDS Metrocom, part of TDS Telecom Inc. will be extending its fiber optic network within
the City of Madison during June and July 2009. This work is being done to expand the
TDS Metrocom fiber optic network and provide additional access to TDS Metrocom service.
There will be a public hearing on this project on June 3, 2009, at at 5: 30 p.m. in Room 108
of the City County Building, 210 Martin Luther king Jr. Blvd.
An approved City of Madison contractor will be hired by TDS Metrocom to install the buried
fiber optic cable within Right of Way limits at the following locations:
Pflaum Road east from Stoughton Road to
Advance Road south on Advance Road to
Progress Road south on Progress Road to
2617 Progress Road
Restoration of any damage within right of way will be completed in accordance with the
City of Madison's standard specifications. All damaged sidewalk slabs will be replaced
with 5" lift concrete. All damage done to grass will be restored with a four inch covering
of black dirt and seed specified by the City of Madison. All restoration required within
the traveled portion of the roadway will also be completed in accordance with the
City of Madison's standard specifications.
If any persons have additional questions or concerns regarding this project please call
Dave Borgen of TDS Metrocom Inc. at 608 664 4438 or the City of Madison, Civil
Engineer lll, LeAnne Hannan at 608 266 4057.
PUB. WSJ: May 22, 2009