Madison, WI Header
File #: 57239    Version: 1 Name: Recreate position #1854 from an Engineer 4, CG18, R12, to a Principal Engineer 1, CG18, R15, at the Water Utility, and reallocate incumbent A. Wiederhoft into the new position.
Type: Resolution Status: Passed
File created: 8/27/2019 In control: Human Resources Department
On agenda: 9/17/2019 Final action: 9/17/2019
Enactment date: 9/23/2019 Enactment #: RES-19-00679
Title: Recreate position #1854 from an Engineer 4, CG18, R12, to a Principal Engineer 1, CG18, R15, at the Water Utility, and reallocate incumbent A. Wiederhoft into the new position.
Sponsors: Satya V. Rhodes-Conway
Attachments: 1. PB Memo Water Utility Engineerng Section 8-2019.pdf

Fiscal Note

The annualized cost of the proposed reclassification is $15,577 (including benefits). The impact on the 2019 budget is approximately $3,894. Costs associated with the reclassification will be absorbed within the agency’s 2019 budget.

 

Title

Recreate position #1854 from an Engineer 4, CG18, R12, to a Principal Engineer 1, CG18, R15, at the Water Utility, and reallocate incumbent A. Wiederhoft into the new position.

 

Body

Resolution that position #1854, currently identified as an Engineer 4, CG18, R12, is deleted and recreated as a Principal Engineer 1, CG18, R15, in the Water Utility operating budget, and incumbent A. Wiederhoft is reallocated to the new position, thereof.