File #: 47716    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract for The Eighth Addition to Blackhawk - Phase 5, Private Contract No. 2260.
Type: Resolution Status: Passed
File created: 6/16/2017 In control: BOARD OF PUBLIC WORKS
On agenda: 7/11/2017 Final action: 7/11/2017
Enactment date: 7/18/2017 Enactment #: RES-17-00550
Title: Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract for The Eighth Addition to Blackhawk - Phase 5, Private Contract No. 2260.
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2260 complete street Schedule A.pdf, 2. 2260 storm Schedule A Unit Cost.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
7/11/20171 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
6/28/20171 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
6/19/20171 Engineering Division Refer  Action details Meeting details Not available

Fiscal Note

Private Contract, No City Funds Are Required.

Title

Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract for The Eighth Addition to Blackhawk - Phase 5, Private Contract No. 2260.

Body

WHEREAS, the McKenzie 300 Corporation, has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:  Eighth Addition to Blackhawk - Phase 5.

 

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) be and are hereby accepted. 

 

2. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant in Service". 

 

 

Increase in Total Plant Value per Schedule “A”                     $32,034.53

 

 

3. That the street improvements, including the bituminous pavement, on the following streets be and are hereby accepted:

 

 

                     Shadow Ridge Trail from the west line of Lot 480 to the west line of Lot 482 (existing street).

                     Shadow Ridge Trail from the west line of Lot 458 (existing street) to the west line of Lot 486.

 

 

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B2260 $ 36,928.43 for a useful life of 40 years.