Madison, WI Header
File #: 28087    Version: 1 Name: Recreating an Engineering Aide 3 position (#1200) in Traffic Engineering as an Engineering Program Assistant 1 and reallocating the incumbent to the new position.
Type: Resolution Status: Passed
File created: 10/22/2012 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 11/27/2012 Final action: 11/27/2012
Enactment date: 11/28/2012 Enactment #: RES-12-00883
Title: Recreating an Engineering Aide 3 position (#1200) in Traffic Engineering as an Engineering Program Specialist 1 and reallocating the incumbent to the new position.
Sponsors: Paul R. Soglin
Attachments: 1. PB Memo Eng Aide 3 CY.pdf, 2. PosDesc_Yang 2012.pdf
Fiscal Note
Costs for the remainder of 2012 are estimated at $201 for wage expense, plus $73 for fringe benefits, or a total expense of $274.  These amounts will be accommodated in 2012 by the management of Traffic Engineering salary savings.  Annualized costs are estimated at $5,753, or $7,841 including benefits, based upon a comparison of maximums.  These costs will be included in future year Traffic Engineering operating budget requests.
Title
Recreating an Engineering Aide 3 position (#1200) in Traffic Engineering as an Engineering Program Specialist 1 and reallocating the incumbent to the new position.
Body
Resolution that the position of Engineering Aide 3 (#1200) in Compensation Group 16, Range 14 in the permanent salary detail of the Traffic Engineering budget is deleted and recreated as a Engineering Program Specialist in Compensation Group 16, Range 17, thereof.  Be it further resolved that the incumbent (C. Yang) be reallocated to the new position.