Fiscal Note
The proposed resolution approves plan documents for the citywide installation and repair of curb, gutter, sidewalk, and concrete pavement patches in 2019 at a total estimated cost of $470,000. Funding for the improvements is provided by adopted 2019 capital budget via the Sidewalk Program within Engineering Bicycle/Pedestrian as well as the Pavement Management program within Engineering Major Streets, provided by GO Borrowing.
MUNIS:
11881-403-200 $300,000
11881-403-174 $4,000
11856-402-200 $166,000
Title
Approving plans and specifications and authorizing the Board of Public Works to advertise and receive bids for Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair-2019. (Citywide)
Body
BE IT RESOLVED,
1) That the plans and specifications for Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair-2019, be and are hereby approved.
2) That the Board of Public Works be and is hereby authorized to advertise and receive bids for said project.
3) That the Mayor and City Clerk are hereby authorized to sign and grant easements or right-of-way release or procurement documents, maintenance agreements or encroachment agreements, as necessary and grant or accept dedication of lands and/or easements from/to the Developer/Owner for public improvements located outside of existing public fee title or easement right-of-ways.