Madison, WI Header
File #: 10394    Version: 1 Name: Authorizing the Mayor and City Clerk to execute agreements with the State of Wisconsin Department of Transportation for cost sharing for the reconstruction of the IH 94 structure over Sprecher Road and the new construction of the IH 94 structure over the
Type: Resolution Status: Passed
File created: 5/9/2008 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 6/17/2008 Final action: 6/17/2008
Enactment date: 6/19/2008 Enactment #: RES-08-00631
Title: Authorizing the Mayor and City Clerk to execute agreements with the State of Wisconsin Department of Transportation for cost sharing for the reconstruction of the IH 94 structure over Sprecher Road and the new construction of the IH 94 structure over the proposed extension of Milwaukee Street. (3rd AD)
Sponsors: Lauren Cnare, Joseph R. Clausius
Title
Authorizing the Mayor and City Clerk to execute agreements with the State of Wisconsin Department of Transportation for cost sharing for the reconstruction of the IH 94 structure over Sprecher Road and the new construction of the IH 94 structure over the proposed extension of Milwaukee Street. (3rd AD)
Body
PREAMBLE

The Wisconsin Department of Transportation (WDOT) is proposing to reconstruct IH 94 from the Badger Interchange to CTH N. The project includes the reconstruction of the structure over Sprecher Road and the construction of a new structure over the proposed extension of Milwaukee Street. The structure at Sprecher Road is in poor condition and nearing the end of its service life. WDOT has determined that the bridge should be replaced. The proposed project is planned for construction in the year 2010. In conjunction with the proposed project, the Sprecher Road structure will be built to accommodate the cross section expansion of Sprecher Road and the Milwaukee Street structure will be built to accommodate the cross section of the proposed extension of Milwaukee Street.

The City of Madison and the WDOT propose to enter into an agreement for construction and cost sharing of the proposed project. The basis for cost sharing participation is as follows:

1) Design Engineering: All design-engineering costs necessitated by the street or road construction is 100% eligible for State Funding.

2) Real Estate Acquisition: The City is responsible for 100% of the cost of new right-of-way needed for the proposed Milwaukee Street extension grade separation structures that would not otherwise be needed for the IH 94 expansion project. The State will perform all real estate acquisition activities as part of the IH 94 lane expansion work and retain ownership of this additional right-of-way when the project is complete.

4) Sprecher Road Eastbound (B-13-498) and Westbound (B-13-499) Structures: The State is responsible for 100% of the cost of t...

Click here for full text