Fiscal Note
No appropriation required.
Title
SECOND SUBSTITUTE: Amending Section 37.09(3)(e)1 of the Madison General Ordinances to establish soil infiltration design standards.
Body
DRAFTER’S ANALYSIS: Under the City’s existing ordinances, certain types of land development are required to get a stormwater management permit. As a condition of such permits, the applicant must submit a stormwater management plan documenting the system(s) and measures proposed to control stormwater runoff from the site. Consistent with State law, the City has established stormwater management performance standards, including requirements relating to infiltration of stormwater when 20,000 square feet or more of new impervious area is created. These standards apply to all plats, Certified Survey Maps, development, and redevelopment projects which create a cumulative total of twenty thousand (20,000) square feet or more of new impervious area since October 1, 2004. Infiltration refers to any precipitation that does not leave the site as runoff. Under this ordinance, technical standards for infiltration are being added to the City’s standards applicable to all developments where infiltration is required, which change would require the infiltration design to utilize the best on-site soils for this purpose.
This substitute updates the infiltration standards to make them more clear and specific.
This second substitute makes further changes to these updated standards, including adding a delayed effective date of April 1, 2025.
***********************************************************************************
The Common Council of the City of Madison do hereby ordain as follows:
1. Paragraph 1 entitled “All Developments” of Subdivision (e) entitled “Infiltration” of Subsection (3) entitled “Stormwater Management Performance Standards” of Section 37.09 entitled “Stormwater Management Plan Requirements” of the Madison General Ordinances is amended as follows:
“1. All Development...
Click here for full text