Madison, WI Header
File #: 36253    Version: 1 Name: Accepting bituminous surface improvements constructed by Private Contract In The Meadowlands -Phase 2, Private Contract No. 1967.
Type: Resolution Status: Passed
File created: 11/17/2014 In control: BOARD OF PUBLIC WORKS
On agenda: 12/2/2014 Final action: 12/2/2014
Enactment date: 12/3/2014 Enactment #: RES-14-00903
Title: Accepting bituminous surface improvements constructed by Private Contract In The Meadowlands -Phase 2, Private Contract No. 1967.
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 1967 bituminous Schedule A.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
12/2/20141 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
11/19/20141 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
11/17/20141 Engineering Division Refer  Action details Meeting details Not available
Fiscal Note
Private Contract, No City Funds Are Required.
Title
Accepting bituminous surface improvements constructed by Private Contract In The Meadowlands -Phase 2, Private Contract No. 1967.
Body
 
WHEREAS, Meadowlands Land, LLC has satisfactorily completed the installation of bituminous surface improvements by private contract in accordance with the City of Madison Standard Specifications for Public Works Construction for: The Meadowlands - Phase 2.
 
NOW, THEREFORE, BE IT RESOLVED
 
1. That the bituminous surface improvements on the following streets be and are hereby accepted:
 
·      Silver Dawn Drive from the west line of Lot 40 (existing street) to Golden Maple Road
·      Half Moon Court from Silver Dawn Drive to Silver Dawn Drive (looped street)
·      Red Birch Run from Silver Dawn Drive to the north line of Lot 29
·      Golden Maple Road from ten south line of Lot 53 (existing street) to the north line of Lot 70
 
The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B1967  $44,722.60 for a useful life of 40 years.