Fiscal Note
The cost for the remainder of 2012 is approximately $500 (or $680 including benefits) and is available in the Information Technology budget. The projected annualized cost is $4,765 (or $6,500 including benefits).
Title
Recreate the position (#3868) of "City Channel Cablecast Production Technician" (CG20/R13) as a "City Channel Engineer" (CG16/R14) and reallocate the incumbent (B. Johnson) to the new position. Upon filling the position, the "City Channel Cablecast Production Technician" classification will be deleted.
Body
Resolution to create the classification of "City Channel Engineer" in Compensation Group 16, Range 14, and delete the classification of City Channel Cablecast Production Technician in CG20, Range 13; upon creation of the new classification, position #3868 of "City Channel Cablecast Production Technician" in Compensation Group 20, Range 13, currently occupied by B. Johnson, in the permanent salary detail of the IT budget, is deleted and recreated as a "City Channel Engineer" in CG16, Range 14, and that the incumbent is reallocated to the new position, thereof.