Madison, WI Header
File #: 59576    Version: 1 Name: Approving plans and specifications and authorizing the Board of Public Works to advertise and receive bids for Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (Districts 4 and 8) - 2020
Type: Resolution Status: Passed
File created: 2/13/2020 In control: Engineering Division
On agenda: 3/3/2020 Final action: 3/3/2020
Enactment date: 3/6/2020 Enactment #: RES-20-00177
Title: Approving plans and specifications and authorizing the Board of Public Works to advertise and receive bids for Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (Districts 4 and 8) - 2020. (4th & 8th ADs)
Sponsors: BOARD OF PUBLIC WORKS, Michael E. Verveer
Attachments: 1. Ald Dist 4 Map_Include w Sawcutting.pdf, 2. Ald Dist 8 Map_Include w Sawcutting.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
3/3/20201 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
2/19/20201 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
2/13/20201 Engineering Division Refer  Action details Meeting details Not available

Fiscal Note

The proposed resolution approves plan documents for Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (Districts 4 and 8) - 2020. The estimated cost of this work is $56,000. Funding is available in the 2020 Adopted Capital Budget Engineering - Bicycle and Pedestrian Sidewalk Program (MUNIS 12687-403-200).

 

Title

Approving plans and specifications and authorizing the Board of Public Works to advertise and receive bids for Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (Districts 4 and 8) - 2020. (4th & 8th ADs)

Body

The sawcutting program provides for the horizontal sawcutting of trip hazards in Districts 4 and 8 and throughout the City to comply with ADA guidelines.  The sawcuts are funded solely by the City.

 

NOW THEREFORE BE IT RESOLVED that the plans and specifications for Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (Districts 4 and 8) - 2020 be and are hereby approved:

 

BE IT FURTHER RESOLVED that the Board of Public Works be and is hereby authorized to advertise for and receive bids for the required public works contracts.