Madison, WI Header
File #: 19783    Version: 1 Name: Recreation of an Engineer 2 position (#4093) as an Engineer 3 in the Water Utility budget and reallocating the incumbent to the new position
Type: Resolution Status: Passed
File created: 8/27/2010 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 9/21/2010 Final action: 9/21/2010
Enactment date: 9/22/2010 Enactment #: RES-10-00776
Title: Recreation of an Engineer 2 position (#4093) as an Engineer 3 in the Water Utility budget and reallocating the incumbent to the new position.
Sponsors: David J. Cieslewicz
Attachments: 1. Eng2-4SD.pdf, 2. Eng2PD.pdf, 3. Engineer2-WaterMemo.pdf, 4. Registration Forms - Oppose 9-21-10.pdf
Fiscal Note
The cost for the remainder of 2010 is approximately $638 (or $899 including benefits) and is available in the Water Utility's operating budget.  The projected annualized cost is $6,168 (or $8,691 including benefits.)
Title
Recreation of an Engineer 2 position (#4093) as an Engineer 3 in the Water Utility budget and reallocating the incumbent to the new position.
Body
Resolution that the position of Engineer 2 (#4093) in Compensation Group 18, Range 08, currently occupied by Adam Wiederhoeft, in the permanent salary detail of the Water Utility budget is repealed and recreated as an Engineer 3 in Compensation Group 18, Range 10, and that the incumbent is reallocated to the new position thereof.