Madison, WI Header
File #: 70626    Version: 1 Name: Approving roadway geometry for the reconstruction of Lake Mendota Dr. from Baker Ave. to the City of Madison limits.
Type: Resolution Status: Passed
File created: 3/21/2022 In control: BOARD OF PUBLIC WORKS
On agenda: 3/29/2022 Final action: 4/19/2022
Enactment date: 4/25/2022 Enactment #: RES-22-00270
Title: Approving roadway geometry for the reconstruction of Lake Mendota Dr. from Baker Ave. to the City of Madison limits. (19th AD)
Sponsors: Keith Furman, Yannette Figueroa Cole
Attachments: 1. Lake Mendota Dr. Geometrics Display.pdf, 2. LMD Geometrics Slides.pdf, 3. LMD Survey Results.pdf, 4. City of Madison Rural to Urban Street Reconstruction Stormwater Approach.pdf, 5. LMDpetition03072022.pdf, 6. 70626_BPW_PublicComments.pdf, 7. 70626 PublicComment-RegistrantsReport.pdf, 8. [Link]Lake Mendota Drive Leg File Hyperlink from 3/9 TC meeting, 9. [public]Lake Mendota Drive (LMD) Proposed Sidewalk Design Input and Request for Response.pdf, 10. [publc]Lake Mendota Drive (LMD) Sidewalk Safety and Environmental Considerations.pdf, 11. [BPW]Lake Mendota Dr Geometry (Legistar 70626).pdf, 12. [public]Lake Mendota dr..pdf, 13. [public]Lake Mendota Dr - Good plans so far, but why bidirectional_.pdf, 14. [public]EJM-22003 Transportation Commission.pdf, 15. [public]Resident comments re #70626 - Opposed.pdf, 16. [public]zoom meeting.pdf, 17. [public]Item # 70626 Tomorrow's TC Meeting Written Comment.pdf, 18. [public]Item # 70626 -- Lake Mendota Drive project.pdf, 19. [public]Fitzpatrick_Item # 70626 Tomorrow's TC Meeting Written Comment.pdf, 20. [public]LMD LID stormwater justification 20220412.pdf, 21. [public]LMD Item #5, 70626.pdf, 22. [public]FW_ Lake Mendota Drive ideas with pictures added.pdf, 23. [public]Item # 70626 Transportation Commissoin with pictures added.pdf, 24. [public]Lake Mendota Drive project.pdf, 25. [public]Articles on shared street designs.pdf, 26. [public]Young_Lake Mendota Drive Project.pdf, 27. [public]TC 4_13_22 Agenda 70626.pdf, 28. [public]Agenda item #5_ 70626 .pdf, 29. [public]City v Citizens Differences.pdf, 30. [public]Agenda item #5_ 70626.pdf, 31. [public]LMD is a park PDF.pdf, 32. [public]Agenda Item #5, 70626, Final Approval of roadway geometry of LMD.pdf, 33. [public]Please slow down.pdf, 34. [public]Testimony for tonight's Transprotation Committee Meeting; Item #70626.pdf, 35. [public]Bauer.TransportationCommissionComments.041322.Final.pdf, 36. [public]Item #70626 - Modify LMD reconstruction plan to better protect our lakes and drinking water.pdf, 37. TC RegistrantsReport (04.13.22)_Redacted.pdf, 38. BPW_PublicComment_LReisdorf1.pdf, 39. BPW_PublicComment_LReisdorf2.pdf, 40. [public]City of Madison_engagement.pdf, 41. [public]4-15-22_Furman_Email.pdf, 42. CC_Public_Comment_70626.pdf, 43. Public Comment_MRickman.pdf, 44. CC_Public_Comment_2 _70626.pdf, 45. CC_Public_Comment_3_70626.pdf, 46. Woonerf and shared street ideas for Lake Mendota Drive 4_19 CC meeting.pdf, 47. Bauer.CommmonCouncilComments.041922.pdf, 48. 220419 Common Council Registrants Report.pdf, 49. Kimberly McBride Public Comment Lake Mendota Drive reconstruction .pdf, 50. Neil A. Robinson Public Comment Lake Mendota Dr.pdf, 51. Peggy Scallon Public Comment Lake Mendota Drive Project.pdf, 52. Bauer, Jeffrey PC LMD.pdf

Fiscal Note

No Funds Required.

Title

Approving roadway geometry for the reconstruction of Lake Mendota Dr. from Baker Ave. to the City of Madison limits. (19th AD)

Body

PREAMBLE

WHEREAS, The City of Madison, has proposed projects to reconstruct portions of Lake Mendota Dr. in 2022, 2023, and 2024

 

WHEREAS, The City of Madison Engineering Division has completed a preliminary design through the extents of the planned projects, which includes: reconstruction of Lake Mendota Dr. to include curb and gutter and a typical street width of 24 ft. to 26 ft. to accommodate two-way vehicle and bike travel on the street with parking allowed on one side, and to include sidewalks as shown the preliminary plan (on one side on the westerly and easterly ends, and on both sides in the middle section), along with traffic calming measures such as, but not limited, to bumpouts, traffic circles, and speed humps.

 

WHEREAS, slight modifications may be made as part of the detailed, final design for each project in order to accommodate additional tree protection or space for new tree plantings, modifications for stormwater treatment features such as terrace rain gardens, adjustments to the locations of traffic calming devices, preservation of historic and cultural resources, or as necessary due to grades/topography.

 

NOW, THEREFORE, BE IT RESOLVED, that the roadway geometry for Lake Mendota Dr. from Baker Ave. to the City of Madison limits is hereby approved.