File #: 83999    Version: 1 Name: Termination of the Declaration of Public Works Emergency per Section 62.15(1b) of the Wisconsin Statutes Proclaiming an Emergency for the repair of sanitary sewer force main on the Mendota Mental Institute grounds (301 Troy Drive)
Type: Resolution Status: Passed
File created: 6/18/2024 In control: Engineering Division
On agenda: 8/6/2024 Final action: 8/6/2024
Enactment date: 8/12/2024 Enactment #: RES-24-00497
Title: Termination of the Declaration of Public Works Emergency per Section 62.15(1b) of the Wisconsin Statutes Proclaiming an Emergency for the repair of sanitary sewer force main on the Mendota Mental Institute grounds (301 Troy Drive) (District 18)
Sponsors: Charles Myadze

Fiscal Note

 The resolution terminates the Public Works Emergency declared on May 8, 2024 (Legistar #83221) and documents total payment of $30,172.28 to contractor Capitol Underground ($10,571.53) and the Madison Metropolitan Sewerage District ($19,600.75) for emergency repair of a sanitary sewer force main on the Mendota Mental Institute grounds. Capitol Underground completed the main sewer repair and the Madison Metropolitan Sewerage District completed the wastewater control. The emergency is satisfied and closed with the work accepted as completed. Funding for the repair is available in the 2024 Sewer Utility Adopted Operating Budget. No additional appropriation is required.

 

Title

Termination of the Declaration of Public Works Emergency per Section 62.15(1b) of the Wisconsin Statutes Proclaiming an Emergency for the repair of sanitary sewer force main on the Mendota Mental Institute grounds (301 Troy Drive) (District 18)

Body

WHEREAS, a Public Emergency per Wisconsin Statute Section 62.15(1b) of the Wisconsin Statutes was declared on May 8, 2024 to complete a force main sewer repair that was discovered by Capitol Underground at the corner of private roads Memorial Drive and North Road,

 

WHEREAS, after attempting to complete the repair, Engineering Operations believed that management of the break exceeded their capabilities,

 

WHEREAS, the force main sewer repair was completed by Capitol Underground with Wastewater Control handled by Madison Metropolitan Sewerage District(MMSD),

 

THEREFORE, BE IT RESOLVED, that the emergency is hereby declared to be satisfied and is closed and the work is accepted as completed; and,

 

BE IT FURTHER RESOLVED, that the contractor, Capitol Underground & Madison Metropolitan Sewerage District are paid in full.