Madison, WI Header
File #: 47719    Version: 1 Name: Accepting street improvements (including bituminous surface pavement) constructed by Private Contract 6701-6921 McKee Rd. PUD, Private Contract No. 2300.
Type: Resolution Status: Passed
File created: 6/16/2017 In control: BOARD OF PUBLIC WORKS
On agenda: 7/11/2017 Final action: 7/11/2017
Enactment date: 7/18/2017 Enactment #: RES-17-00553
Title: Accepting street improvements (including bituminous surface pavement) constructed by Private Contract 6701-6921 McKee Rd. PUD, Private Contract No. 2300.
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2300 street complete Schedule A.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
7/11/20171 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
6/28/20171 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
6/19/20171 Engineering Division Refer  Action details Meeting details Not available

Fiscal Note

Private Contract, No City Funds Are Required.

Title

Accepting street improvements (including bituminous surface pavement) constructed by Private Contract 6701-6921 McKee Rd. PUD, Private Contract No. 2300.

Body

WHEREAS, Mad Grove, LLC has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:  6701-6921 McKee R. PUD

 

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said street improvements (including bituminous surface pavement) be and are hereby accepted. 

 

2. That the street improvements, including the bituminous pavement, on the following streets be and are hereby accepted:

 

 

                     Widening the west side of Maple Grove Drive approximately 10 feet commencing south of the traffic signal on McKee Road, continuing south adjacent to Lot 2.

                     Sidewalk construction on the west side of Maple Grove Drive adjacent to the development.

 

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B2300  $51,474.30 for a useful life of 40 years.