Legislation Details

File #: 76846    Version: 1 Name: Accepting bituminous surface pavement constructed by Private Contract in Eagle Trace - Surface Paving, Private Contract No. 8193.
Type: Resolution Status: Passed
File created: 3/14/2023 In control: Engineering Division
On agenda: 4/18/2023 Final action: 4/18/2023
Enactment date: 4/19/2023 Enactment #: RES-23-00301
Title: Accepting bituminous surface pavement constructed by Private Contract in Eagle Trace - Surface Paving, Private Contract No. 8193. (9th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 8193 Street Schedule A including bituminous UPDATED Dec2021.pdf

Fiscal Note

No City Funds required. Private contract.

Title

Accepting bituminous surface pavement constructed by Private Contract in Eagle Trace - Surface Paving, Private Contract No. 8193. (9th AD)

Body

WHEREAS, VHET LLC, has satisfactorily completed the installation bituminous surface pavement by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, for:  Eagle Trace - Surface Paving.

 

NOW, THEREFORE, BE IT RESOLVED

 

That the bituminous surface street improvements on the following streets be and are hereby accepted:

 

•                     Tawny Elm Parkway from the South line of Lot 116 to Sister Oak Drive

•                     Tawny Elm Parkway from Sister Oak Drive to Hollow Aspen Lane

•                     Tawny Elm Parkway from Hollow Aspen Lane to White Fox Lane

•                     Tawny Elm Parkway from White Fox Lane to the North line of Lot 162

•                     White Fox Lane from the West line of Lot 201 to Rustic Rise Way

•                     White Fox Lane from Rustic Rise Way to Tawny Elm Parkway

•                     White Fox Lane from Tawny Elm Parkway to the North line of Lot 49

•                     Hollow Aspen Lane from the West line of Lot 149 to Tawny Elm Parkway

•                     Rustic Rise Way from 137’ South of White Fox Lane to White Fox Lane

•                     N Sugar Maple Lane from the South line of Lot 9 to Sister Oak Drive

•                     N Sugar Maple Lane from Sister Oak Drive to the North line of Lot 16

•                     Sister Oak Drive from the West line of Lot 68 to N Sugar Maple Lane

•                     Sister Oak Drive from Tawny Elm Parkway to the East line of Outlot 4

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 11931 by $64,128.94 for a useful life of 40 years.