Madison, WI Header
File #: 49263    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract in Linden Park Phase 11, Private Contract No. 2353.
Type: Resolution Status: Passed
File created: 10/20/2017 In control: BOARD OF PUBLIC WORKS
On agenda: 11/21/2017 Final action: 11/21/2017
Enactment date: 11/27/2017 Enactment #: RES-17-00885
Title: Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract in Linden Park Phase 11, Private Contract No. 2353.
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2353 Linden Park Ph 11 Sanitary Schedule A Unit Cost.pdf, 2. 2353 Linden Park Ph 11Storm Schedule A Unit Cost.pdf, 3. 2353-Street complete Schedule A.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
11/21/20171 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
11/1/20171 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
10/20/20171 Engineering Division Refer  Action details Meeting details Not available
Fiscal Note
Private Contract, No Appropriation Required.
Title
Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract in Linden Park Phase 11, Private Contract No. 2353.
Body
WHEREAS, Veridian Homes AB, LLC, has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) by Private Contract in Linden Park - Phase 11.


NOW, THEREFORE, BE IT RESOLVED

1. That said sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) be and are hereby accepted.

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".

SANITARY SEWER ACCOUNTING DATA

A) Total Contract Value (including Engineering
and Miscellaneous Costs) $ 50,822.97

B) Contributions in Aid of Construction:
a) Public Sewer Components $ 50,822.97
b) Sewer Laterals $ -0-

C) Investments in Capital (MSU Share) $ -0-

D) Total Plant Value $ 50,822.97


3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".


Increase in Total Plant Value per Schedule “A” $33,645.70.


4. That the street improvements, including the bituminous pavement, on the following streets be and are hereby accepted:

· Weatherstone Road from the west line of Lot 211 to the east line of Lot 204.
· Rung Way from the south line of Lot 305 to Weatherstone Road.
· Reflection Drive from the south line of Lot 143 to Weatherstone Road.


The att...

Click here for full text