Fiscal Note
The annualized cost of the proposed reclassification is $1,015 (including benefits). The impact on the 2016 budget is approximately $339. Costs associated with the reclassification will be absorbed within the agency’s 2016 budget.
Title
Recreating the vacant position #3655 from a 1.0 FTE Planning Technician (CG20, R17) to a 1.0 FTE Planner 1, (CG18, Range 06-Class H158) in the Planning Division budget.
Body
Resolution recreating the vacant 1.0 FTE position #3655 from Planning Technician (CG20, R17), to Planner 1 in Compensation Group 18, Range 06, in the permanent salary detail of the Planning Division budget, thereof.