Fiscal Note
No City Funds required. Private contract.
Title
Accepting bituminous surface pavement constructed by Private Contract in Village at Autumn Lake Phase 15 Surface Paving, Private Contract No. 9385 (District 17)
Body
WHEREAS, VAL, LLC has satisfactorily completed the installation bituminous surface pavement by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, for: Village at Autumn Lake Phase 15 Surface Paving.
NOW, THEREFORE, BE IT RESOLVED
That the bituminous surface street improvements on the following streets be and are hereby accepted:
• Woodbine Drive from Felland Road to August Moon Drive
• Woodbine Drive from August Moon Drive to East Property Line of Lot 1452
• August Moon Drive from Woodbine Drive to Clover Basin Lane
• August Moon Drive from Clover Basin Lane to North Property Line of Lot 1433
• Clover Basin Lane from August Moon Drive to East Property Line of Lot 1426
• Felland Road from 130 FT S of Woodbine Drive to Woodbine Drive
• Felland Road from Woodbine Drive to S of Tranquility Trail
• Felland Road from S of Tranquility Trail to Tranquility Trail
The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 14929 by $59,408.67 for a useful life of 40 years.