Madison, WI Header
File #: 85315    Version: 1 Name: Accepting bituminous surface pavement constructed by Private Contract in First Addition to 1000 Oaks Phase 10 - Surface Paving, Private Contract No. 8964.
Type: Resolution Status: Passed
File created: 9/18/2024 In control: Engineering Division
On agenda: 10/8/2024 Final action: 10/8/2024
Enactment date: 10/10/2024 Enactment #: RES-24-00602
Title: Accepting bituminous surface pavement constructed by Private Contract in First Addition to 1000 Oaks Phase 10 - Surface Paving, Private Contract No. 8964. (District 9)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 8964 Streets Schedule A bituminous.pdf

Fiscal Note

No City Funds required. Private Contract.

Title

Accepting bituminous surface pavement constructed by Private Contract in First Addition to 1000 Oaks Phase 10 - Surface Paving, Private Contract No. 8964. (District 9)

Body

WHEREAS, VH 1000 Oaks, LLC has satisfactorily completed the installation bituminous surface pavement by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, for:  First Addition to 1000 Oaks Phase 10 - Surface Paving.

 

 

NOW, THEREFORE, BE IT RESOLVED

 

 

That the bituminous surface street improvements on the following streets be and are hereby accepted:

 

 

                     Summer Willow Lane from 166 FT E of Cherry Bark Road to Quaking Aspen Road.

                     Quaking Aspen Road from 118 FT N of Winter Basil Drive to Summer Willow Lane.

                     Quaking Aspen Road from Summer Willow Lane to 123 FT S of Tawny Acorn Drive.

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 13291 by $17,064.85 for a useful life of 40 years.