Madison, WI Header
File #: 36116    Version: 1 Name: Accepting bituminous surface improvements constructed by Private Contract In Linden Park - Phase 9, Private Contract No. 2246.
Type: Resolution Status: Passed
File created: 11/10/2014 In control: BOARD OF PUBLIC WORKS
On agenda: 12/2/2014 Final action: 12/2/2014
Enactment date: 12/3/2014 Enactment #: RES-14-00886
Title: Accepting bituminous surface improvements constructed by Private Contract In Linden Park - Phase 9, Private Contract No. 2246.
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2246 bituminous Schedule A.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
12/2/20141 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
11/19/20141 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
11/10/20141 Engineering Division Refer  Action details Meeting details Not available
Fiscal Note
Private Contract, No City Funds Are Required.
Title
Accepting bituminous surface improvements constructed by Private Contract In Linden Park - Phase 9, Private Contract No. 2246.
Body
WHEREAS, Veridian Homes AB, LLC has satisfactorily completed the installation of bituminous surface improvements by private contract in accordance with the City of Madison Standard Specifications for Public Works Construction for: Linden Park - Phase  9.
 
NOW, THEREFORE, BE IT RESOLVED
 
1. That the bituminous surface improvements on the following streets be and are hereby accepted:
 
•      Silkwood Trail from the west line of Lot 104 (existing street) to the west line of Lot 68.
•      Hollybush Lane from southbound Color Peak Road to the east line of Lot 49 (existing street).
 
The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B2246  $ 16,776.09 for a useful life of 40 years.