Fiscal Note
The proposed resolution approves plans and specifications and authorizes the Board of Public Works to advertise and receive bids for Stricker Pond Forebay Dredging. The project will take place over two years in 2025/2026 with a total estimated cost of $475,000 ($220,000 in 2025 and $255,000 in 2026). The 2025 portion of the funding is available in the 2025 Adopted Stormwater Operating Budget (Munis #15697 - $110,000) and the 2025 Adopted Stormwater Capital Budget (Munis #15468 - $110,000). Funding for 2026 is included in the 2026 Stormwater Operating Budget request. No additional appropriation is required.
Title
Approving plans and specifications and authorizing the Board of Public Works to advertise and receive bids for Stricker Pond Forebay Dredging. (District 19)
Body
1) That the plans and specifications for Stricker Pond Forebay Dredging, be and are hereby approved.
2) That the Board of Public Works be and is hereby authorized to advertise and receive bids for said project.
3) That the Mayor and City Clerk are hereby authorized to accept dedication of lands and/or easements from the Developer/Owner for public improvements located outside of existing public fee title or easement right-of-ways.