Fiscal Note
The projected cost for 2009 is approximately $3,360 (or $4,330 including fringe benefits), which will be accommodated in the 2009 Water Utility Operating Budget by managing salary savings. The projected annualized cost is $6,700 (or $9,230 including fringe benefits).
Title
Resolution that the position (#1886) of Engineer 3 in Compensation Group 18, Range 10, (occupied by D. DeMaster) in the permanent salary detail of the Water Utility budget is repealed and recreated as Engineer 4 in Compensation Group 18, Range 12, thereof. Be it further resolved that the incumbent shall be reallocated to said position.
Body
Resolution that the position (#1886) of Engineer 3 in Compensation Group 18, Range 10, (occupied by D. DeMaster) in the permanent salary detail of the Water Utility budget is repealed and recreated as Engineer 4 in Compensation Group 18, Range 12, thereof. Be it further resolved that the incumbent shall be reallocated to said position.
Editor's Note:
|
2008 Annual |
2008 Annual |
2008 Annual |
Compensation |
Minimum |
Maximum |
Maximum +12% |
Group/Range |
(Step 1) |
(Step 5) |
w/Longevity |
18/10 |
$55,127 |
$66,253 |
$74,204 |
18/12 |
$60,265 |
$72,756 |
$81,484 |