Madison, WI Header
File #: 35813    Version: 1 Name: Accepting sanitary sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Eighth Addition to Blackhawk - Phase 3, Private Contract No. 2187.
Type: Resolution Status: Passed
File created: 10/10/2014 In control: COMMON COUNCIL
On agenda: 11/18/2014 Final action: 11/18/2014
Enactment date: 11/24/2014 Enactment #: RES-14-00804
Title: Accepting sanitary sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Eighth Addition to Blackhawk - Phase 3, Private Contract No. 2187.
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2187 sched a.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
11/18/20141 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
10/22/20141 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
10/10/20141 Engineering Division Refer  Action details Meeting details Not available
Fiscal Note
Private Contract, No City Funds Are Required.
Title
Accepting sanitary sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Eighth Addition to Blackhawk - Phase 3, Private Contract No. 2187.
Body
WHEREAS, McKenzie 300 Corporation has satisfactorily completed the installation of sanitary sewer, and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:  Eighth Addition to Blackhawk - Phase 3.
 
NOW, THEREFORE, BE IT RESOLVED
 
1.  That said sanitary sewer and street improvements (excluding bituminous surface pavement) be and are hereby accepted.  
 
2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".  
 
SANITARY SEWER ACCOUNTING DATA
 
A)      Total Contract Value (including Engineering
      and Miscellaneous Costs)                  $      29,788.64      
 
B)      Contributions in Aid of Construction:
      a)      Public Sewer Components            $      29,788.64      
      b)      Sewer Laterals                  $      -0-            
 
C)      Investments in Capital (MSU Share)      $      -0-            
 
D)      Total Plant Value                        $      29,788.64      
 
 
 
 
4. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:
 
 
ยท      Big Stone Trail from the north line of Lot 461 (existing street) to the south line of Lot 459
 
 
The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B2187  $ 66,009.02 for a useful life of 40 years.