Madison, WI Header
File #: 11061    Version: 1 Name: Improvements accepted for Sign Shop HVAC Modifications; Traffic Engineering Building - 1120 Sayle Street, Contract No. 6039.
Type: Resolution Status: Passed
File created: 6/20/2008 In control: BOARD OF PUBLIC WORKS
On agenda: 7/15/2008 Final action: 7/15/2008
Enactment date: 7/17/2008 Enactment #: RES-08-00743
Title: Improvements accepted for Sign Shop HVAC Modifications; Traffic Engineering Building - 1120 Sayle Street, Contract No. 6039. (13th AD)
Sponsors: BOARD OF PUBLIC WORKS
Title
Improvements accepted for Sign Shop HVAC Modifications; Traffic Engineering Building - 1120 Sayle Street, Contract No. 6039.  (13th AD)
Body
BE IT RESOLVED, that the storm sewer improvements on Sign Shop HVAC Modifications, Traffic Engineering Building - 1120 Sayle Street have been completed on 4/5/08 be and are hereby accepted.  
 
Original Contract Sum      $         135,978.00
(Based on Actual Units)      $         135,978.00
Net Change by Change Orders      $                   0.00 or 0.00%
Liquidated Damages      $                   0.00
Final Contract Amount      $         135,978.00
 
Fiscal Note
Breakdown of Costs by Account Number:
 
Acc't. No. EP01-54312-810416-00-5825000        $33,994.50
Acc't. No. CB57-54312-810416                          $101,983.50