File #: 56233    Version: 1 Name: Awarding Public Works Contract 9411, McKenna Boulevard Flood Mitigation, and amending the 2019 Engineering-Major Streets and Stormwater Utility Capital Budgets to provide funding for this work.
Type: Resolution Status: Passed
File created: 6/7/2019 In control: FINANCE COMMITTEE
On agenda: 7/2/2019 Final action: 7/2/2019
Enactment date: 7/5/2019 Enactment #: RES-19-00505
Title: Amending the 2019 capital budgets for Engineering-Major Streets and Stormwater Utility and Awarding Public Works Contract 9411, McKenna Boulevard Flood Mitigation (1st AD).
Sponsors: Barbara Harrington-McKinney
Attachments: 1. Contract 9411.pdf
Fiscal Note
The proposed resolution amends the adopted 2019 Major Streets Capital Budget by authorizing a net-neutral transfer of existing budget authority across major programs within the Engineering-Major Streets budget. $1,000,000 of GO borrowing authority will be transferred from the various major programs to the McKenna/Park Edge Flood Mitigation project as follows: $220,000 from McKee Rd; $360,000 from Bridge Repair & Replacement; $370,000 from Railroad Crossings & Quiet Zones; and $50,000 from Reconstruction Streets.

Additionally, this resolution amends the adopted 2019 Stormwater Utility Capital Budget by authorizing a net-neutral transfer of existing budget authority across major programs within the Stormwater Utility budget. $630,000 of GO borrowing authority will be transferred from Stormwater Quality System Improvements to the McKenna/Park Edge Flood Mitigation project.

(220,000) 10245-402-170
(220,000) 10245-402-801
(360,000) 11783-402-200
(360,000) 11783-402-802
(370,000) 12241-402-200
(370,000) 12241-402-802
(50,000) 12242-402-170
(50,000) 12242-402-801
1,000,000 12011-402-170
1,000,000 12011-402-801

(630,000) 12258-84-174
(630,000) 12258-84-801
630,000 12011-84-174
630,000 12011-84-801

Title
Amending the 2019 capital budgets for Engineering-Major Streets and Stormwater Utility and Awarding Public Works Contract 9411, McKenna Boulevard Flood Mitigation (1st AD).
Body
WHEREAS, on August 20, 2018 the Westside of the City of Madison experienced a very significant rain event with rainfall amounts ranging from 5 to 10 inches which fell in approximately 6 hours; and

WHEREAS, this rain event resulted in significant flash flooding damages to portions of the City including the McKenna Boulevard area; and

WHEREAS, City Engineering has been working on flood solutions to the McKenna Boulevard drainage problem with the neighborhood since approximately July of 2016 and;

WHEREAS, City Engineering has worked with the neighborhood to arrive at the flood ...