Madison, WI Header
File #: 29880    Version: 1 Name: Recreating position #1070 as an Engineer 4 in the Engineering budget and reallocating incumbent James Wolfe to the new position.
Type: Resolution Status: Passed
File created: 4/19/2013 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 5/21/2013 Final action: 5/21/2013
Enactment date: 5/22/2013 Enactment #: RES-13-00368
Title: Recreating position #1070 as an Engineer 4 in the Engineering budget and reallocating incumbent James Wolfe to the new position.
Sponsors: Paul R. Soglin
Attachments: 1. PBMemo Engineer 4 Wolfe.pdf, 2. PD Engineer 4 Wolfe.pdf, 3. Engineer1-4.pdf
Fiscal Note
Costs for the remainder of 2013 are estimated at $2,271, or $2,596 including benefits.  Funding will be made available by the management of salary savings.  Annualized costs are estimated at $3,536, or $4,042 including benefits.
 
Title
Recreating position #1070 as an Engineer 4 in the Engineering budget and reallocating incumbent James Wolfe to the new position.
 
Body
Resolution recreating the 1.0 FTE position #1070 from Engineer 3 (CG18, Range 10), to Engineer 4 (CG18, Range 12), in the Engineering Division budget and reallocating the incumbent, J. Wolfe, to the new position, thereof.