Madison, WI Header
File #: 16129    Version: 1 Name: Reallocating employee P. Nehmer (Position #1235) to the existing position of Engineering Aide 2 in Traffic Engineering.
Type: Resolution Status: Passed
File created: 9/29/2009 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 1/19/2010 Final action: 1/19/2010
Enactment date: 1/20/2010 Enactment #: RES-10-00044
Title: Reallocating employee P. Nehmer (Position #1235) to the existing position of Engineering Aide 2 in Traffic Engineering.
Sponsors: David J. Cieslewicz
Attachments: 1. posdesc.pdf, 2. Memo.pdf
Fiscal Note
The cost for the remainder of 2009 is estimated to be $51 (or $71 including fringe benefits) and is available in the Traffic Engineering operating budget.  The projected annualized cost is $2,635 (or $3,644 including fringe benefits).
Title
Reallocating employee P. Nehmer (Position #1235) to the existing position of Engineering Aide 2 in Traffic Engineering.
Body
Resolution that employee P. Nehmer (position #1235) in the permanent salary detail of the Traffic Engineering Division budget is reallocated to the existing position of Engineering Aide 2 thereof.
 
Editor's Note:
 
 
2009 Annual
2009 Annual
2009 Annual
Compensation
Minimum
Maximum
Maximum +12%
Group/Range
(Step 1)
(Step 5)
Longevity
16/11
$42,622
$47,530
$53,222
16/13
$45,015
$50,165
$56,186