Madison, WI Header
File #: 58829    Version: 1 Name: Accepting sanitary sewer and street improvements (including bituminous surface pavement) constructed by Private Contract in The Meadowlands - Phase 8 (3rd AD), Private Contract No. 2430
Type: Resolution Status: Passed
File created: 12/20/2019 In control: Engineering Division
On agenda: 3/3/2020 Final action: 3/3/2020
Enactment date: 3/6/2020 Enactment #: RES-20-00158
Title: Accepting sanitary sewer and street improvements (including bituminous surface pavement) constructed by Private Contract in The Meadowlands - Phase 8 (3rd AD), Private Contract No. 2430
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2430 Sanitary Schedule A Unit Cost.pdf, 2. 2430 Streets Schedule A bituminous Schedule A.pdf, 3. 2430 excluding bituminous Schedule A.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
3/3/20201 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
2/19/20201 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
12/20/20191 Engineering Division Refer  Action details Meeting details Not available

Fiscal Note

Private Contract, No City Funds Required.

Title

Accepting sanitary sewer and street improvements (including bituminous surface pavement) constructed by Private Contract in The Meadowlands - Phase 8 (3rd AD), Private Contract No. 2430

Body

WHEREAS, the The Meadowlands 40, LLC, has satisfactorily completed the installation of sanitary sewer and street improvements (including bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:  The Meadowlands - Phase 8.

 

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said sanitary sewer and street improvements (including bituminous surface pavement) be and are hereby accepted. 

 

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service". 

 

SANITARY SEWER ACCOUNTING DATA

 

A)                     Total Contract Value (including Engineering

                     and Miscellaneous Costs)                                                               $                     60,498.72                     

 

B)                     Contributions in Aid of Construction:

                     a)                     Public Sewer Components                                          $                     60,498.72                     

                     b)                     Sewer Laterals                                                                                    $                     -0-                                          

 

C)                     Investments in Capital (MSU Share)                                          $                     -0-                                          

 

D)                     Total Plant Value                                                                                    $                     60,498.72                     

 

 

3. That the street improvements, including the bituminous pavement, on the following streets be and are hereby accepted:

 

 

                     Reston Heights Drive from West Line of Lot 183 to Field Flower Way

                     Littlemore Drive from Field Flower Way to East Line of Lot 158

                     Field Flower Way from Reston Heights Drive to South Line of Lot 187

 

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 10861  $ 114,904.47 for a useful life of 40 years.