Madison, WI Header
File #: 27032    Version: 1 Name: Reallocating incumbent Kelly Miess to the budgeted level of Engineer 3 in the Water Utility Budget.
Type: Resolution Status: Passed
File created: 7/9/2012 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 8/7/2012 Final action: 8/7/2012
Enactment date: 8/9/2012 Enactment #: RES-12-00578
Title: Reallocating incumbent Kelly Miess to the budgeted level of Engineer 3 in the Water Utility Budget.
Sponsors: Paul R. Soglin
Attachments: 1. PBMemo Engineer 3 Miess.pdf, 2. Engineer1-4.pdf
Fiscal Note
The cost for the remainder of 2012 is approximately $1,175 (or $1,600 including benefits) and is available in the Water Utility budget.  The projected annualized cost is $6,350 (or $8,660 including benefits).
 
Title
Reallocating incumbent Kelly Miess to the budgeted level of Engineer 3 in the Water Utility Budget.
 
Body
Resolution reallocating the incumbent of position #3807 to the budgeted level of Engineer 3 (CG18, Range 10), in the Water Utility budget.