File #: 57451    Version: 1 Name: Amending the 2019 Capital Budget for Stormwater Utility and Awarding Public Works Contract 8466, Southwest Bikepath Culvert Replacement at Waite Circle - 2019
Type: Resolution Status: Passed
File created: 9/11/2019 In control: BOARD OF PUBLIC WORKS
On agenda: 10/1/2019 Final action: 10/1/2019
Enactment date: 10/4/2019 Enactment #: RES-19-00699
Title: Amending the 2019 Capital Budget for Stormwater Utility and Awarding Public Works Contract 8466, Southwest Bikepath Culvert Replacement at Waite Circle - 2019. (11th AD)
Sponsors: Arvina Martin, Zachary Henak
Attachments: 1. Contract 8466.pdf

Fiscal Note

The proposed resolution amends the 2019 Adopted Capital Budget by transferring $810,000 from the Stormwater Quality System Improvements program (MUNIS Project 11665) to the Citywide Flood Mitigation program (MUNIS Project 11513) for the culvert replacement on the Southwest Bike Path. The increased funding is needed due to due bids that came in higher than budget, along with adding a box culvert to the project’s scope.

 

Title

Amending the 2019 Capital Budget for Stormwater Utility and Awarding Public Works Contract 8466,  Southwest Bikepath Culvert Replacement at Waite Circle - 2019. (11th AD)

Body

WHEREAS, in the summer of 2017 an existing stone arch culvert that drains lands within the West Wingra Watershed had failed and was in need of an emergency repair for fear that the bikepath would collapse; and

WHEREAS, city crews performed emergency repairs to the existing stone arch culvert by sliplining the existing stone arch culvert with a 60”pipe to prevent eminent failure; and

WHEREAS, the 60” pipe decreased capacity of the drainage way by restricting flow; and

WHEREAS, on August 20, 2018 the Westside of the City of Madison experienced a very significant rain event with rainfall amounts ranging from 5 to 10 inches which fell in approximately 6 hours; and

WHEREAS, this rain event resulted in significant flash flooding damages to portions of the City including the Waite Circle area; and

WHEREAS, City Engineering has worked with the neighborhood to arrive at the flood relief public works improvement project represented and bid under Contract 8466; and

WHEREAS, City Engineering received three (3) competitive bids for construction of the design solution agreed to with the neighborhood; and

WHEREAS, the resulting bids were approximately $450,000 over budget; and

WHEREAS, the City will be procuring box culvert and construction materials under a separate Request for Bids for approximately $75,000; and

WHEREAS, the improvements will constructed to allow for flexibility in flood control in the future if necessary upon completion of the West Wingra Watershed Study; and

WHEREAS, additional fund in the amount of $285,000 will be used for other flood mitigation projects that are in the planning stages.

 

NOW, THEREFORE, BE IT RESOLVED that:

1.                     The following low bids for miscellaneous improvements be accepted and that the Mayor and City Clerk be and are hereby authorized and directed to enter into a contract with the low bidder contained herein, subject to the Contractor's compliance with Section 39.02 of the Madison General Ordinances concerning compliance with the Affirmative Action provisions and subject to the Contractor's compliance with Section 33.07 of the Madison General Ordinances regarding Best Value Contracting.

2.                     The funds be encumbered to cover the cost of the projects contained herein. See attached document (Contract No. 8466) for itemization of bids.

The 2019 Stormwater Utility Capital Budget is amended according to the fiscal note to cover the costs associated with infrastructure improvement necessary to implement the flood mitigation project known as the Southwest Bikepath Culvert Replacement at Waite Circle - 2019.