File #: 87604    Version: Name: SUBSTITUTE Amending the 2025 Water Utility Capital Budget to Increase Existing Budget Authority to Extend New Water Main along Mid Town Road to Improve System Redundancy and Hydraulic Conditions Ahead of Adjacent Development Projects (Districts 1 and 20).
Type: Resolution Status: Passed
File created: 3/17/2025 In control: Water Utility
On agenda: 4/15/2025 Final action: 4/15/2025
Enactment date: Enactment #: RES-25-00262
Title: SUBSTITUTE Amending the 2025 Water Utility Capital Budget to Increase Existing Budget Authority to Extend New Water Main along Mid Town Road to Improve System Redundancy and Hydraulic Conditions Ahead of Adjacent Development Projects (District 1, District 20).
Sponsors: John W. Duncan, Regina M. Vidaver
Attachments: 1. Memo - MWU 2025 Capital Budget Amendment - Mid Town Rd WM.pdf, 2. Attachment A - Proposed Water Main Exhibit.pdf, 3. V1 Resolution MWU 2025 Capital Budget Amendment.pdf

...Fiscal Note

The proposed resolution amends the Water Utility's 2025 Adopted Capital Budget and authorizes an additional $700,000 in new budget authority to existing project #15387, Mid Town Hydraulic Improvement inside the Water Main's New Program (Munis #12507). The increase in budget authority will be funded through existing Water Utility cash reserves. The proposed increase does not increase Water Utility debt obligations or request new borrowing.

 

The 2025 Water Utility adopted Capital Budget will be amended to reflect the following:

15387-86-179 Mid Town Road Hydraulic Improvement increase $700,000

15387-86-806 Mid Town Road Hydraulic Improvement increase $700,000

 

...Title
SUBSTITUTE Amending the 2025 Water Utility Capital Budget to Increase Existing Budget Authority to Extend New Water Main along Mid Town Road to Improve System Redundancy and Hydraulic Conditions Ahead of Adjacent Development Projects (District 1, District 20).

 

...Body
The adopted 2025 Water Utility Capital budget allocated budget authority for various water main pipeline projects related to water main replacements, water system improvement in conjunction with roadway reconstruction projects, and major/stand-alone roadway improvement projects. The adopted 2025 Water Utility Capital Budget did not allocate budget authority for any Utility-funded water main extensions or hydraulic improvements by new water main extensions.

 

The project 15387-86-179, “MID TOWN ROAD HYDRAULIC IMPROVEMENT” was established with a budget of $50,000 in 2024 to begin project scope establishment, preliminary scope analysis and preliminary design efforts, with the intent to authorize budget upon establishment of adjacent and nearby projects along Mid Town Road, such as Mid Town Meadows and the realignment of Mid Town Road.

 

The purpose of this proposed pipeline is to close an existing water system gap on Mid Town Road that will provide redundancy to a significant portion of the southwest Madison public water system, allow Pressure Zone 9 to expand and serve the recently approved Mid Town Meadows development, and expand operational flexibility between the adjacent west-side pressure zones.

 

The project limits are beyond the limits of any of the identified adjacent projects, and the inclusion of this scope into the adjacent projects is not feasible as private developments or as work located beyond the proposed project limits.

The Utility is prepared to proceed with final design and construction of this hydraulic improvement project in spring of 2025, with construction occurring in late 2025. The work is expected to be completed by the end of 2025.

 

NOW, THEREFORE, BE IT RESOLVED that the 2025 Water Utility Capital budget is hereby amended to increase the budget authority of project 15387 Mid Town Road Hydraulic Improvement to appropriate $700,000 in Water Utility Cash Reserves, as described herein.