File #: 77141    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Chapel View - Phase 1, Private Contract No. 8249
Type: Resolution Status: Passed
File created: 4/6/2023 In control: Engineering Division
On agenda: 5/2/2023 Final action: 5/2/2023
Enactment date: 5/8/2023 Enactment #: RES-23-00344
Title: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Chapel View - Phase 1, Private Contract No. 8249 (9th AD).
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 8249 Chapel View Ph 1_Storm Schedule A Unit Cost.pdf, 2. 8249 Chaple View Ph 1_Sanitary Schedule A Unit Cost.pdf, 3. 8249 Street Schedule A excluding bituminous UPDATED Dec2021.pdf

Fiscal Note

No City Funds required. Private contract.

Title

Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Chapel View - Phase 1, Private Contract No. 8249 (9th  AD).

Body

WHEREAS, Chapel View Development Company, Inc., has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:  Chapel View - Phase 1.

 

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) be and are hereby accepted. 

 

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service". 

 

SANITARY SEWER ACCOUNTING DATA

 

A)                     Total Contract Value (including Engineering

                     and Miscellaneous Costs)                                                               $                     54,085.08                     

 

B)                     Contributions in Aid of Construction:

                     a)                     Public Sewer Components                                          $                     54,085.08                     

                     b)                     Sewer Laterals                                                               $                     ____-0-                     

 

C)                     Investments in Capital (MSU Share)                     $                     ____-0-                     

 

D)                     Total Plant Value                                                                                    $                     54,085.08                     

 

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service". 

 

 

Increase in Total Plant Value per Schedule “A”                     $41,067.40.

 

 

 

4. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:

 

 

                     White Fox Lane from 227’ SE of Dragon Willow Lane to Dragon Willow Lane

                     White Fox Lane from Dragon Willow Lane to 248’ NW of Dragon Willow Lane

                     Dragon Willow Lane from 305’ South of White Fox Lane to White Fox Lane

                     Burnt Sienna Drive from White Fox lane to 35’ North of White Fox Lane

                     White Fox Lane from 45’ East of Burnt Sienna Drive to Burnt Sienna Drive (10’ x 45’ mill & overlay only)

                     White Fox Lane from Burnt Sienna Drive to 45’ West of Burnt Sienna Drive (10’ x 45’ mill & overlay only)

 

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 11957 $204,737.32 for a useful life of 40 years.