File #: 93140    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements constructed by Private Contract In Woodstone - Phase 2, Private Contract No. 2325.
Type: Resolution Status: Items Referred
File created: 5/12/2026 In control: BOARD OF PUBLIC WORKS
On agenda: 6/9/2026 Final action:
Enactment date: Enactment #:
Title: Accepting sanitary sewer, storm sewer, and street improvements constructed by Private Contract In Woodstone - Phase 2, Private Contract No. 2325 (District 9).
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. Woodstone Ph 2 Storm Schedule A Unit Cost.pdf, 2. Woodstone Ph 2 Sanitary Schedule A Unit Cost.pdf, 3. 2325 Street Schedule A complete Schedule A.pdf

Fiscal Note

No City Funds required. Private contract.

Title

Accepting sanitary sewer, storm sewer, and street improvements constructed by Private Contract In Woodstone - Phase 2, Private Contract No. 2325 (District 9).

Body

WHEREAS, Pheasant Ridge, LLC, has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:  Woodstone - Phase 2.

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said sanitary sewer, storm sewer, and street improvements be and are hereby accepted. 

 

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service". 

 

SANITARY SEWER ACCOUNTING DATA

 

A)                     Total Contract Value (including Engineering

                     and Miscellaneous Costs)                                                               $                     100,022.00                     

 

B)                     Contributions in Aid of Construction:

                     a)                     Public Sewer Components                                          $                     100,022.00                     

                     b)                     Sewer Laterals                                                               $                     ____-0-                     

 

C)                     Investments in Capital (MSU Share)                     $                     ____-0-                     

 

D)                     Total Plant Value                                                                                    $                     100,022.00                     

 

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service". 

 

Increase in Total Plant Value per Schedule “A”                     $301,111.98.

 

4. That the street improvements on the following streets be and are hereby accepted:

 

                     Little Bear Drive from North Line of Lot 5 to Stoneywood Blvd

                     Little Bear Drive from Stoneywood Blvd to Cobalt Street

                     Stoneywood Blvd from Little Bear Drive to Fargo Trail

                     Fargo Trail from North Line of Lot 145 to Stoneywood Blvd

                     Fargo Trail from Stoneywood Blvd to Cobalt Street

                     Fargo Trail from Cobalt Street to South Line of Lot 172

                     Cobalt Street from Little Bear Drive to Fargo Trail

                     Cobalt Street from Fargo Trail to East Plat Line

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B2325 by $323,539.89 for a useful life of 40 years.