File #: 04423    Version: 1 Name: A Resolution authorizing the Mayor & City Clerk to enter into a revised agmnt with the WDOT for the Marsh Rd Overpass of the S Beltline Hwy (USH 12/18) & terminating the Memorandum of Understanding for Bridge Imp. on the East Side of Madison.
Type: Resolution Status: Passed
File created: 8/29/2006 In control: BOARD OF PUBLIC WORKS
On agenda: 9/19/2006 Final action: 9/19/2006
Enactment date: 9/21/2006 Enactment #: RES-06-00799
Title: Authorizing the Mayor and City Clerk to enter into a revised agreement with the Wisconsin Department of Transportation for the Marsh Road Overpass of the South Beltline Highway (USH 12/18) and terminating the Memorandum of Understanding for Bridge Improvements on the East Side of Madison. (Various ADs)
Sponsors: Common Council By Request
Fiscal Note
No Additional Funds Required.  All funding has been previously encumbered.  
 
Total Cost             $4,000,000
Federal/State Share       $2,050,000
City Share            $1,950,000
Title
Authorizing the Mayor and City Clerk to enter into a revised agreement with the Wisconsin Department of Transportation for the Marsh Road Overpass of the South Beltline Highway (USH 12/18) and terminating the Memorandum of Understanding for Bridge Improvements on the East Side of Madison. (Various ADs)
Body
 
Preamble
 
On August 12, 2003 the City of Madison entered into a Memorandum Of Understanding (MOU) with the WDOT that provided for cost sharing on 4 bridges over the interstate including the Marsh Road Bridge over the Beltline Highway.  The agreement also allowed for the advancement of the Marsh Road Bridge over the Beltline Highway by financing an amount in excess of the normal City share in exchange for a credit later on future bridge projects identified in the MOU.  Those projects include the Cottage Grove Road, Buckeye Road and Milwaukee Street Bridges over Interstate 90.  The WDOT did not have sufficient funds available to finance the Marsh Road Overpass project at that time.  On June 30, 2003, in accordance with the MOU, the City entered into a Project Agreement with the WDOT for construction of the Marsh Road Bridge over the Beltline Highway and funded the local share with funds from TID 24.  
 
On May 18 2006  the City of Madison entered into a revised agreement for the West Beltline Frontage Road / Todd Drive Project that used the entire credit identified in both the MOU and the Project Agreement for the Marsh Road Overpass on the West Beltline Frontage Road / Todd Drive Project.  On May 18, 2006, the City of Madison entered into a revised agreement for the Cottage Grove Road / CTH BB Overpass of  Interstate 90 that called for the use of local funds in place of the credit for the City of Madison share of the Project.  
 
This resolution authorizes the execution of an agreement that updates the existing Marsh Road Overpass Agreement to reflect what the City has agreed to in both the West Beltline Frontage Road / Todd Drive Agreement and the Cottage Grove Road / CTH BB Overpass Agreement.  This resolution also terminates the MOU for Bridge Improvements on the East Side of Madison.  The MOU is out of date in respect to the use of the credit.   
 
Now Therefore be it resolved that the Mayor and City Clerk are hereby authorized to execute a revised agreement with the Wisconsin Department of Transportation for the Marsh Road Overpass of the South Beltline Highway (USH 12/18), and
 
Be it further resolved that the Mayor and City Clerk are hereby authorized to terminate the existing Memorandum of Understanding for Bridge Improvements on the East Side of Madison.