Brown updated the Committee on UW-Madison projects:
- WIMR West Wedge: Under construction.
- Nielsen Tennis Stadium Outdoor Courts: Construction to start soon.
- Lot 129/130: In design development.
- UW Houses Renovations: Roof repair work continuing.
- Vet Med Expansion: Future project in 2019-2021 capital budget.
- Natatorium Feasibility Study: Feasibility study complete; awaiting enumeration in the 2019-2021 Capital Budget.
- Linden Drive Parking Garage (Lot 62): Preliminary design is underway.
- Meat Science and Muscle Biology Building: Construction is on schedule.
- Babcock Hall Renovation and CDR Addition: The contractor is mobilizing on the site. Removal of the Science House will begin soon.
- Camp Randall South End Zone Seating: Awaiting enumeration.
- Camp Randall Field House & Field House South Plaza: A&E firm selected for design and will begin design development soon.
- Engineering Hall Structures Lab Addition: Completion of construction is delayed pending reconstruction of a bearing wall.
- Chemistry Instructional Addition & Renovation: Construction bids are due in late July. Construction planned to start in late summer or fall 2018.
- Hoofers Boat Dock and Deck Replacement: Will be bid soon for a fall construction start.
- SERF Replacement ("The Nick"): Under construction.
- Hamel Music Center: Construction continuing. A "soft" opening is planned for spring 2019.
- Witte Hall Renovation: Construction is continuing.
- Kohl Center Addition: Awaiting enumeration in the 2019-2021 Capital Budget.
- South Campus Utility Project: Dayton Street portion is completing final construction documents and will start in November 2018 for a November 2019 completion. The Charter Street portion will begin construction this month and be completed in November 2018. The street will be closed through early afternoon for much of construction.