Legislation Details

File #: 95589    Version: 1 Name: Accepting the Final Report and Recommendations for the Nine Springs Creek Watershed Study for Parks-owned lands. (District 10 & District 14)
Type: Communication Status: Held in Commission
File created: 11/12/2026 In control: BOARD OF PARK COMMISSIONERS
On agenda: Final action:
Enactment date: Enactment #:
Title: Accepting the Final Report and Recommendations for the Nine Springs Creek Watershed Study for Parks-owned lands. (District 10 & District 14)
Attachments: 1. 95589 NineSpringsWatershedStudyRecommendations_BPC 2026-12-02.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
No records to display.

Title

Accepting the Final Report and Recommendations for the Nine Springs Creek Watershed Study for Parks-owned lands. (District 10 & District 14)

 

Body

Engineering is bringing the completed Nine Springs Watershed Study before the Board of Park Commissioners, seeking acceptance of the final report as it pertains to Parks-owned lands.

 

Since 2018 City Engineering has been completing watershed studies across 20 study areas citywide to identify and understand areas at risk of stormwater flooding and develop recommendations to reduce flooding. The Nine Springs Watershed Study covers areas within the City of Madison generally south of the Beltline from South Towne Dr to the UW-Madison Southern Arboretum.

 

City Engineering has identified conceptual projects to meet the Stormwater Utility flood mitigation targets in the Nine Springs Creek Watershed that, if implemented, would have temporary impacts on Parks’ land. These two potential projects include storm sewer improvements along existing alignments in Knollwood Park and Baxter Park. Future detailed plans would come back to BPC when the projects are budgeted and have undergone detailed design.