Madison, WI Header
File #: 74549    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements and bituminous surface pavement constructed by Private Contract Linden Park - Phase 10, Private Contract No. 2311.
Type: Resolution Status: Passed
File created: 11/4/2022 In control: Engineering Division
On agenda: 12/6/2022 Final action: 12/6/2022
Enactment date: 12/9/2022 Enactment #: RES-22-00796
Title: Accepting sanitary sewer, storm sewer, and street improvements and bituminous surface pavement constructed by Private Contract Linden Park - Phase 10, Private Contract No. 2311 (1st AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2311 Street Schedule A complete Schedule A (002).pdf, 2. 53B2311 Linden Park Ph 10 STORM Schedule A Unit Cost.pdf, 3. 53B2311_Linden Park Ph 10 SANITARY Schedule A Unit Cost.pdf, 4. 2311 bituminous Schedule A.pdf
Fiscal Note
No City Funds required. Private contract.
Title
Accepting sanitary sewer, storm sewer, and street improvements and bituminous surface pavement constructed by Private Contract Linden Park - Phase 10, Private Contract No. 2311 (1st AD)
Body
WHEREAS, Veridian Homes AB, LLC, has satisfactorily completed the installation of sanitary sewer, storm sewer, street improvements, and bituminous surface pavement by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in: Linden Park - Phase 10.


NOW, THEREFORE, BE IT RESOLVED

1. That said sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) be and are hereby accepted.

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".

SANITARY SEWER ACCOUNTING DATA

A) Total Contract Value (including Engineering
and Miscellaneous Costs) $ 51,221.61

B) Contributions in Aid of Construction:
a) Public Sewer Components $ 51,221.61
b) Sewer Laterals $ -0-

C) Investments in Capital (MSU Share) $ -0-

D) Total Plant Value $ 51,221.61

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".


Increase in Total Plant Value per Schedule “A” $42,790.00


4. That the street improvements, including the bituminous pavement, on the following streets be and are hereby accepted:


· Redan Dr from Valley View Rd to S Lot Line of Lot 283 (existing street)
· Weatherstone Dr from W Plat Line to E Line of Lot 297
· Shining Rock ...

Click here for full text