File #: 59431    Version: 1 Name: Accepting storm sewer and street improvements (including bituminous surface pavement) constructed by Private Contract 6001 Mineral Point Road / 6102 Odana Road CSM, Private Contract No. 7878
Type: Resolution Status: Passed
File created: 2/4/2020 In control: Engineering Division
On agenda: 3/3/2020 Final action: 3/3/2020
Enactment date: 3/6/2020 Enactment #: RES-20-00161
Title: Accepting storm sewer and street improvements (including bituminous surface pavement) constructed by Private Contract 6001 Mineral Point Road / 6102 Odana Road CSM, Private Contract No. 7878 (19th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 7878 Street Schedule A complete Schedule A.pdf, 2. 7878 Storm Schedule A Unit Cost.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
3/3/20201 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
2/19/20201 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
2/4/20201 Engineering Division Refer  Action details Meeting details Not available

Fiscal Note

Private Contract, No City Funds Required.

Title

Accepting storm sewer and street improvements (including bituminous surface pavement) constructed by Private Contract 6001 Mineral Point Road / 6102 Odana Road CSM, Private Contract No. 7878 (19th AD)

Body

WHEREAS, the GCDR Research, LLC, has satisfactorily completed the installation of storm sewer and street improvements (including bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:  6001 Mineral Point Road / 6102 Odana Road CSM.

 

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said storm sewer and street improvements (including bituminous surface pavement) be and are hereby accepted. 

 

 

2. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service". 

 

 

Increase in Total Plant Value per Schedule “A”                     $56,034.

 

 

3. That the street improvements, including the bituminous pavement, on the following streets be and are hereby accepted:

 

 

                     Genomic Drive from Research Park Blvd to North Line of Lot 1

 

 

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 11523  $206,604.48 for a useful life of 40 years.