Fiscal Note
Private Contract, No City Funds Required.
Title
Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract in Village at Autumn Lake - Phase 3, Private Contract No. 7863. (17th AD)
Body
WHEREAS, VAL, LLC has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in: Village at Autumn Lake - Phase 3.
NOW, THEREFORE, BE IT RESOLVED
1. That said sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) are hereby accepted.
2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".
SANITARY SEWER ACCOUNTING DATA
A) Total Contract Value (including Engineering
And Miscellaneous Costs) $ 38,357.00
B) Contributions in Aid of Construction:
a) Public Sewer Components $ 38,357.00
b) Sewer Laterals $ -0-
C) Investments in Capital (MSU Share) $ -0-
D) Total Plant Value $ 38,357.00
3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".
Increase in Total Plant Value per Schedule “A” $44,631.95.
4. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:
• Summer Shine Drive from West Line of Lot 623 to Piper Brooks Drive
• Piper Brooks Drive from Summer Shine Drive to North Lot Line of Lot 617
• Waterfall Way from Piper Brooks Drive to East Line of Lot 652
The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 11508 $89,831.16 for a useful life of 40 years.