Madison, WI Header
File #: 47772    Version: 1 Name: Accepting bituminous surface pavement constructed by Private Contract in First Addition to Hawks Ridge Estates, Private Contract No. 2129.
Type: Resolution Status: Passed
File created: 6/22/2017 In control: BOARD OF PUBLIC WORKS
On agenda: 7/11/2017 Final action: 7/11/2017
Enactment date: 7/18/2017 Enactment #: RES-17-00572
Title: Accepting bituminous surface pavement constructed by Private Contract in First Addition to Hawks Ridge Estates, Private Contract No. 2129.
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2129 bituminous Schedule A-Hawks Ridge Estates.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
7/11/20171 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25, and Close the Public HearingPass Action details Meeting details Not available
6/28/20171 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
6/22/20171 Engineering Division Refer  Action details Meeting details Not available

Fiscal Note

Private Contract, No City Funds Are Required.

Title

Accepting bituminous surface pavement constructed by Private Contract in First Addition to Hawks Ridge Estates, Private Contract No. 2129.

Body

WHEREAS, TRMckenzie, Inc. has satisfactorily completed the installation bituminous surface pavement by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, for:  The First Addition to Hawks Ridge Estates.

 

 

NOW, THEREFORE, BE IT RESOLVED

 

 

That the bituminous surface street improvements on the following streets be and are hereby accepted:

 

 

                     Dregers Way from the west line of Lot 54 (existing street) to Hawkstone Way

                     Hawkstone Way from Dregers Way to the south plat line

                     Silverstone Lane from the west line of Lot 44 (existing street) to the east line of Lot 36 (existing street).

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B2129 by $34,885.48 for a useful life of 40 years.