Madison, WI Header
File #: 44329    Version: 1 Name: Authorizing the Mayor and City Clerk to execute an amended agreement with the State of Wisconsin Department of Transportation for the improvement of E. Johnson Street (N. Baldwin Street to First Street).
Type: Resolution Status: Passed
File created: 9/2/2016 In control: BOARD OF PUBLIC WORKS
On agenda: 9/20/2016 Final action: 9/20/2016
Enactment date: 9/22/2016 Enactment #: RES-16-00737
Title: Authorizing the Mayor and City Clerk to execute an amended agreement with the State of Wisconsin Department of Transportation for the improvement of E. Johnson Street (N. Baldwin Street to First Street). (2nd and 12th ADs)
Sponsors: Larry Palm, Ledell Zellers
Fiscal Note
In the adopted 2016 capital budget Engineering - Major Streets has budgeted $80,000 for the Johnson Street East Reconstruction from Baldwin Street to First Street (MUNIS 10287). The funding budgeted for 2016 is sufficient for the planned design costs that are associated with this proposed agreement; funding is provided by GO borrowing. The scope of the project out-years is sufficiently planned in the 2016 adopted CIP for the specified work and external funding sources that will be provided via authorization of the proposed agreement.

The proposed resolution authorizes the agreement with an estimated local cost in 2016 of $60,000.

MUNIS:
10287-402-170


Title
Authorizing the Mayor and City Clerk to execute an amended agreement with the State of Wisconsin Department of Transportation for the improvement of E. Johnson Street (N. Baldwin Street to First Street). (2nd and 12th ADs)
Body
PREAMBLE

The City of Madison is proposing to reconstruct E. Johnson Street from Baldwin Street to First Street.

The project will be constructed under a contract let by the Wisconsin Department of Transportation (WisDOT) and a project Agreement with WisDOT is required for funding, oversight and construction. The proposed project is planned for construction in the year 2019.

The City of Madison entered into an agreement with WISDOT for preliminary design on April 19, 2015, authorized by RES-15-00259, File ID 37503. A revised agreement is required to include construction costs for street, sanitary and water.

The City of Madison and WisDOT propose to enter into an amended agreement for construction and cost sharing of the proposed project. The basis for cost sharing participation is as follows:

1) Design Engineering: All design-engineering costs necessitated by the street reconstruction are 100% Local Funding.

2) Local Utilities: The City shall pay for 100% of the cost of installing or adjusting new w...

Click here for full text