Madison, WI Header
File #: 35967    Version: 1 Name: Accepting bituminous surface improvements constructed by private contract in Secret Places at Siggelkow Preserve - Phase 4, Private Contract 2144
Type: Resolution Status: Passed
File created: 10/24/2014 In control: BOARD OF PUBLIC WORKS
On agenda: 11/18/2014 Final action: 11/18/2014
Enactment date: 11/24/2014 Enactment #: RES-14-00813
Title: Accepting bituminous surface improvements constructed by private contract in Secret Places at Siggelkow Preserve - Phase 4, Private Contract 2144.
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2144 sched a.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
11/18/20141 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
11/5/20141 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
10/24/20141 Engineering Division Refer  Action details Meeting details Not available
Fiscal Note
Private Contract. No City Funds Are Required.
Title
Accepting bituminous surface improvements constructed by private contract in Secret Places at Siggelkow Preserve - Phase 4, Private Contract 2144.
Body
WHEREAS, Great Neighborhoods South, LLC has satisfactorily completed the installation of bituminous surface improvements by private contract in accordance with the City of Madison Standard Specifications for Public Works Construction for: Secret Places at Siggelkow Preserve - Phase 4.
 
NOW, THEREFORE, BE IT RESOLVED
 
1. That the bituminous surface improvements on the following streets be and are hereby accepted:
 
·      Catalina Parkway from the east line of Lot 41 to the west line of Lot 258.
·      Secret Garden Drive from Bautista Alley (existing street) to the north plat line.
·      Arrowpoint Way from Secret Garden Drive to Bautista Drive.
·      Bautista Drive from Bautista Alley (existing street) to Catalina Parkway.
·      Alley 'O' (Catalina Alley) From Secret Garden Drive to Catalina Parkway.
 
 
 
The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B2144    $67,020.04 for a useful life of 40 years.