Madison, WI Header
File #: 35861    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Grandview Commons - Phase 17, Private Contract No. 2308.
Type: Resolution Status: Passed
File created: 10/16/2014 In control: BOARD OF PUBLIC WORKS
On agenda: 11/18/2014 Final action: 11/18/2014
Enactment date: 11/24/2014 Enactment #: RES-14-00809
Title: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Grandview Commons - Phase 17, Private Contract No. 2308.
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2308.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
11/18/20141 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
10/22/20141 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
10/16/20141 Engineering Division Refer  Action details Meeting details Not available
Fiscal Note
Private Contract, No City Funds Are Required.
Title
Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Grandview Commons - Phase 17, Private Contract No. 2308.
Body
WHEREAS, MREC VH Madison, LLC has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in: Grandview Commons - Phase 17.


NOW, THEREFORE, BE IT RESOLVED

1. That said sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) be and are hereby accepted.

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".

SANITARY SEWER ACCOUNTING DATA

A) Total Contract Value (including Engineering
and Miscellaneous Costs) $ 14,785.76

B) Contributions in Aid of Construction:
a) Public Sewer Components $ 14,785.76
b) Sewer Laterals $ -0-

C) Investments in Capital (MSU Share) $ -0-

D) Total Plant Value $ 14,785.76

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".


Increase in Total Plant Value per Schedule “A” $18,002.49.


4. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:


· Seven Pines Avenue from Galileo Drive to the east plat line.
· Galileo Drive from the south line of Lot 184 (existi...

Click here for full text