File #: 35793    Version: 1 Name: Accepting storm sewer and street improvements (excluding bituminous surface pavement) constructed by Private Contract In The Meadowlands, Phase 5, Private Contract No. 2084.
Type: Resolution Status: Passed
File created: 10/9/2014 In control: BOARD OF PUBLIC WORKS
On agenda: 11/18/2014 Final action: 11/18/2014
Enactment date: 11/24/2014 Enactment #: RES-14-00798
Title: Accepting storm sewer and street improvements (excluding bituminous surface pavement) constructed by Private Contract In The Meadowlands, Phase 5, Private Contract No. 2084.
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2084.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
11/18/20141 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
10/22/20141 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICER  Action details Meeting details Not available
10/9/20141 Engineering Division Refer  Action details Meeting details Not available
Fiscal Note
Private Contract, No City Funds Are Required.
Title
Accepting storm sewer and street improvements (excluding bituminous surface pavement) constructed by Private Contract In The Meadowlands, Phase 5, Private Contract No. 2084.  
Body
WHEREAS, Veridian Homes AB, LLC has satisfactorily completed the installation of storm sewer and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:  The Meadowlands, Phase 5.
 
 
NOW, THEREFORE, BE IT RESOLVED
 
1.  That said storm sewer, and street improvements (excluding bituminous surface pavement) be and are hereby accepted.  
 
2. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".  
 
 
Increase in Total Plant Value per Schedule "A"      $42,949.39.
 
 
3. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:
 
 
·      Juneberry Drive from the northerly line of Lot 107 to Littlemore Drive (existing street).
·      Littlemore Drive from Juneberry Drive (existing street) to the easterly line of Lot 123.
 
 
4.      That the alley improvements on the following street be and are hereby accepted:
 
·      Alley from east right of way of Juneberry Drive to the westerly line of Lot 126, and from southerly line of said Alley to the northerly line of Lot 140.
·      Alley from west right of way of Juneberry Drive to the west line of Lot 102 (existing street).
 
 
 
The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B2084  $ 98,809.77 for a useful life of 40 years.