Madison, WI Header
File #: 29826    Version: 1 Name: Approving plans and specifications and authorizing the Board of Public Works to advertise and receive bids for Warner Park Paths and Bridge Replacement.
Type: Resolution Status: Passed
File created: 4/12/2013 In control: BOARD OF PUBLIC WORKS
On agenda: 4/30/2013 Final action: 4/30/2013
Enactment date: 5/3/2013 Enactment #: RES-13-00333
Title: Approving plans and specifications and authorizing the Board of Public Works to advertise and receive bids for Warner Park Paths and Bridge Replacement.
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 53W1480EN-BPWExhibit.pdf, 2. Pages from North Bridge Warner 4-11-13.pdf, 3. Pages from South Bridge Warner 4-11-13.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
4/30/20131 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
4/17/20131 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
4/12/20131 Engineering Division Refer  Action details Meeting details Not available
Fiscal Note
Total Estimated Cost:            $740,000
 
Sufficient funds are available in the 2013 Capital Budget as follows:
 
CS53-58240-810375-00-53W1480        $ 271,000  Bike Path Reconstruction
CS53-58255-810375-00-53W1480        $ 362,000  Bridge Replacement
CL60-58201-810652-00-60368C00        $   73,000  Path Resurfacing
CL60-58201-810652-00-60368C00       $   34,000  General Land / Water Improvements
 
Title
Approving plans and specifications and authorizing the Board of Public Works to advertise and receive bids for  Warner Park Paths and Bridge Replacement.
Body
PREAMBLE
 
The City of Madison is proposing to reconstruct or resurface approximately 1.5 miles of existing paved, multi-use (bicycle and pedestrian) paths in Warner Park, which will include the replacement of two wooden pedestrian bridges with pre-fabricated steel multi-use bridges on concrete abutments.
 
This is a joint project of Engineering Division and Parks Division. The project includes construction of sidewalk to improve the pedestrian connection between the Community Recreation Center and the Park Shelter and also includes re-grading and restoration of a former skating rink to better serve current park uses.
 
All paths included in the project are in poor condition. The main north-south path in the park is considered to be part of the City's bicycle transportation network and will be reconstructed and widened from 8 feet to 10 feet to meet current bike path design standards and the new bridges will meet bike path and ADA standards. This work will use Engineering funds.
 
Secondary paths will be pulverized and resurfaced in place at their existing width. This work, as well as the sidewalk and the re-grading of the rink will use Parks funds.  
 
This project was presented to Board of Park Commissioners and approved on 4/10/13.
 
NOW, THEREFORE, BE IT RESOLVED, that the plans and specifications for Warner Park Parks and Bridge Replacement are hereby approved; and
 
BE IT FURTHER RESOLVED that the Board of Public works is hereby authorized to advertise and receive bids for said project