Madison, WI Header
File #: 29140    Version: 1 Name: Approving plans and specifications for speed humps and curb modifications on Cherokee Drive between Midvale Boulevard and Waban Hill. (10th AD)
Type: Resolution Status: Passed
File created: 2/14/2013 In control: BOARD OF PUBLIC WORKS
On agenda: 3/5/2013 Final action: 3/5/2013
Enactment date: 3/6/2013 Enactment #: RES-13-00160
Title: Approving plans and specifications for speed humps and curb modifications on Cherokee Drive between Midvale Boulevard and Waban Hill. (10th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. Speed Bumps - Cherokee Dr.pdf
Fiscal Note
Estimated cost $20,000
Budget authority is available in CS53-58260-810358-00-53W1553
Title
Approving plans and specifications for speed humps and curb modifications on Cherokee Drive between Midvale Boulevard and Waban Hill.  (10th AD)
Body
PREAMBLE
This project consists of the installation of speed humps on Cherokee Drive between Midvale Boulevard and Waban Hill.  One speed hump will be constructed midblock on the north side of the median and one speed hump will be constructed midblock on the south side of the median.
 
Construction is scheduled for 2013 and will be included with the Cherokee Drive Utilities with Resurfacing Assessment District-2013 public works contract.  
 
BE IT RESOLVED that the final plans for the installation of speed humps on Cherokee Drive, be and are hereby approved.