Madison, WI Header
File #: 26606    Version: 1 Name: Create a new position of Surveyor 1, CG15, R12, in the Engineering Division budget to be filled through an internal competitive process. Upon filling the position, the underlying vacancy will be deleted to fund the new position.
Type: Resolution Status: Passed
File created: 6/4/2012 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 7/3/2012 Final action: 7/3/2012
Enactment date: 7/5/2012 Enactment #: RES-12-00498
Title: Create a new position of Surveyor 1, CG15, R12, in the Engineering Division budget to be filled through an internal competitive process. Upon filling the position, the underlying vacancy will be deleted to fund the new position.
Sponsors: Paul R. Soglin
Attachments: 1. Eng Ops Mtc Wkr Spec.pdf, 2. PBMemo Eng Ops Mtc Wkr.pdf, 3. PD Surveyor 1.pdf, 4. Surveyor 1 Spec.pdf
Fiscal Note
This resolution would authorize the creation of a new Surveyor 1 (15-12) position in the Engineering Division.  After the new position is filled, an existing position of Engineering Operation Maintenance Worker (15-7) would be deleted.  Based upon a comparison of maximum salaries without longevity, annualized costs of $11,555 (or $13,121 including benefits) can be anticipated.  Costs for the remainder of 2012 would be accommodated by the management of salary savings.
 
Title
Create a new position of Surveyor 1, CG15, R12, in the Engineering Division budget to be filled through an internal competitive process.  Upon filling the position, the underlying vacancy will be deleted to fund the new position.
 
Body
Resolution that a new 1.0 FTE position of Surveyor 1, in Compensation Group 15, Range 12, in the permanent salary detail of the Engineering Division budget, is created to be posted and filled through an internal competitive process. Upon filling the new position, the underlying vacancy will be deleted, thereof.