Madison, WI Header
File #: 24920    Version: 1 Name: Accepting bituminous surface improvements constructed by private contract in Blackhawk Eighth Addition - Phase I, Private Contract 2070.
Type: Resolution Status: Passed
File created: 12/28/2011 In control: BOARD OF PUBLIC WORKS
On agenda: 1/17/2012 Final action: 1/17/2012
Enactment date: 1/18/2012 Enactment #: RES-12-00063
Title: Accepting bituminous surface improvements constructed by private contract in Blackhawk Eighth Addition - Phase I, Private Contract 2070. (9th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. bit 2070.pdf
Fiscal Note
Private Contract. No City Funds Are Required.
Title
Accepting bituminous surface improvements constructed by private contract in Blackhawk Eighth Addition - Phase I, Private Contract 2070.   (9th AD)
Body
WHEREAS, McKenzie 300 Corporation has satisfactorily completed the installation of bituminous surface improvements by private contract in accordance with the City of Madison Standard Specifications for Public Works Construction for: Heather Glenn Replat - Phase II.  
 
 
NOW, THEREFORE, BE IT RESOLVED
 
1. That the bituminous surface improvements on the following streets be and are hereby accepted:
 
·      Blue Aster Trail from 160 ft S of Silver Sage Trail to 102 Ft N of Silver Sage Trail
·      Silver Sage Trail from Blue Aster Trail to 222 Ft SE of Fallen Leaf Drive
·      Fallen Leaf Drive from Silver Sage Trail to 160 Ft NE of Silver Sage Trail
·      River Birch Road from Fallen Leaf Drive to Trappers Trail
·      Trappers Trail from River Birch Road to 255 Ft NE of River Birch Road
·      Big StoneTrail from 106 Ft S of River Birch Road to River Birch Road
 
The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B2070      $40,698.13 for a useful life of 40 years.